More
Language
Display mode
MJ Sailingvideo
October 26, 2025 · 18 min · 42K views · Kent Island
What this video covers
Construction of a home-built catamaran helm station involves relocating the steering position aft toward bulkhead 6 to centralize weight and improve ergonomics.▶ 1:39 To accommodate this shift, the crew re-bonded a section of the cabin top using methacrylate and fabricated a custom MDF plug for the hybrid and Yanmar engine controllers.▶ 2:36 The plug was fared, primed with Alexseal, and glassed into the helm station to create a flush-mounted electronics panel.▶ 3:17 The team also installed a Goyo steering wheel hub spacer to ensure adequate hand clearance.▶ 5:04 Deck work included fairing flush-mounted hatches and daggerboard cases, which required removing stubborn adhesive residue left by Dr. Shrink tape.▶ 6:21 The crew used 80-grit sandpaper, Dykem layout fluid to identify low spots, and Alexseal 303 fine filler to achieve a smooth surface.▶ 11:10 Final exterior preparations involved applying high-build epoxy primer to the bows and bridge deck seams to unify the structure before final fairing.▶ 15:56
More from MJ Sailing
From MJ Sailing — see the channel’s boat, crew, and every analyzed video.