Wildling Sailingvideo

My Project Just Got More Questionable…

May 2, 2025 · 30 min · 130K views

What this video covers

The host of a plywood-and-epoxy catamaran project installs self-tailing winches on the center beam to manage a newly fitted staysail.2:29 Because the beam width prevents through-bolting, the winches are secured with screws into pre-drilled holes filled with impregnating epoxy and sealed with Sikaflex.9:50 The host also fabricates 14 soft-shackle hanks from Dyneema for a Yankee jib to improve hoisting efficiency.10:41 Structural maintenance includes removing a rotten rubbing strip that had allowed plant growth; the host clears the rot, drills out the affected screw holes, and prepares to replace the wood.24:55 Additional tasks include rearming an automatic life jacket and installing a hoop on the boom to retain reefing lines.12:34 The host notes that the staysail, used in medium-to-strong winds, replaces a Yankee jib that previously caused mast bending in 20-to-25-knot winds.1:36 The project remains a work in progress as the host prepares the vessel for ocean passages.

Watch on YouTube

More from Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran RefitOct 2026I Lifted Her Out For a Very Important Rebuild.Sep 2026One Final Refit Before Crossing The Atlantic.Aug 20262 Days Alone at Sea On my Primitive Double-Canoe.Aug 2026

From Wildling Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue