Salt & Tarvideo

Salt & Tar Episode 12

June 29, 2016 · 14 min · 55K views

What this video covers

Garrett and Ruth install the engine into their boat by cutting a temporary hole in the deck to allow for a vertical crane lift.1:13 To prepare the space, Garrett dismantles internal structural bracing and constructs a temporary engine mount using 4x6 beams.0:43 A neighbor, Mark, assists with the operation using a boom truck to hoist the engine over the hull and lower it through the deck opening.1:19 The entire lifting process takes approximately 40 minutes from the initial positioning of the truck to the engine resting inside the hull.12:35 Once the engine is placed, the crew inspects the alignment with the shaft log and confirms the engine sits in its intended location.1:45 The project marks a return to major structural work following the previous winter period.12:25

Watch on YouTube

More from Salt & Tar

Salt & Tar: Ep.361- IN-THE-WATER SurveyOct 2026Meet Victoria - Tour of our William Garden 'Porpoise' built by Robin Fung in 1975Oct 2026Salt & Tar: Ep.360- Good NewsOct 2026Salt & Tar: Ep.359- Memory LaneSep 2026

From Salt & Tar — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue