Garrett’s Adventurevideo

My First Sail in 5 Months (Testing Upgrades)

March 14, 2025 · 23 min · 70K views · Musket Cove

What this video covers

After five months in a marina, the owner of a cruising sailboat completes a series of refit projects before departing for local Fiji waters.16:21 Maintenance tasks included cleaning a fouled propeller, replacing the impeller, and repairing a starter motor connection.0:27 The electrical system upgrade features a new 330-amp-hour lithium battery bank, a DC-to-DC charger, a shore power charger, and a battery monitor, which now allows for electric cooking.16:32 Additional work included installing a new windlass and applying new bottom paint.16:48 During initial sea trials, the boat navigated between reefs near Musket Cove and Laotoka.2:41 The owner reports that the new battery bank requires approximately two hours of generator run-time daily to support refrigeration, fans, and camera equipment, as the vessel lacks space for solar panels.22:20 Following a provisioning trip to the Laotoka market, the boat remains anchored while the owner performs cosmetic hull painting.21:57

Watch on YouTube

More from Garrett’s Adventure

Fixing 87 Osmosis Blisters on my SailboatAug 2026Running my Sailboat VERY agroundMay 2026Sailing to and Exploring Remote Islands on Australia's East Coast NSWApr 2026Living on a Sailboat in SydneyApr 2026

From Garrett’s Adventure — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue