Salt & Tarvideo

Salt & Tar: Ep.304- Lapstrake Planking

September 26, 2024 · 15 min · 40K views · California

What this video covers

Garrett and Ruth construct a 10-foot plywood dinghy using lapstrake planking techniques at a workshop in California.0:17 The build utilizes copper wire stitches to hold the hull shape before permanent bonding.1:11 Garrett routes a rabbet along the bottom edge of the planks to allow for the lapstrake overlap, while reinforcing scarf joints with fiberglass and epoxy.1:30 The process involves fitting planks individually, including the final sheer planks which require beveling at the bow for a mirrored fit.5:55 After completing the hull planking, the pair installs a two-piece alder breast hook to provide structural support to the bow.10:34 Future steps include filleting the frames to the hull and final tightening of the copper wire stitches before applying permanent adhesive.10:40 The project serves as a cruising tender for their primary vessel, Red Aviva, which remains in Mexico.0:32

Watch on YouTube

More from Salt & Tar

Salt & Tar: Ep.361- IN-THE-WATER SurveyOct 2026Meet Victoria - Tour of our William Garden 'Porpoise' built by Robin Fung in 1975Oct 2026Salt & Tar: Ep.360- Good NewsOct 2026Salt & Tar: Ep.359- Memory LaneSep 2026

From Salt & Tar — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue