Sailing Learning By Doingvideo

Great Keppel Island Sailing, Learning By Doing EP33

June 30, 2016 · 7 min · 6K views · Great Keppel Island

What this video covers

The crew of Learning By Doing arrives at Great Keppel Island after an overnight passage and anchors at Keppel Bay Marina in Roslyn Bay to wait out a three-day storm with winds exceeding 30 knots.2:40 While at the marina, the onboard water pump runs continuously, revealing a leak in the hot water system.2:48 Inspection of the bilge shows the aluminum hot water cylinder has corroded through, causing a total loss of water pressure.3:44 The crew removes the damaged unit and decides against an immediate replacement.3:54 During the weather delay, the crew uses a courtesy car to reprovision for a three-week period and visits the boat Tic Tac to use a sewing machine.4:10 They sew new zip-in clear vinyl windows into the cockpit enclosure to improve protection against wind and rain.6:34 The crew prepares to depart at dawn once the wind subsides.5:33

Watch on YouTube

More from Sailing Learning By Doing

How to CHEAPLY transport a 10m Catamaran. (Ep 318)May 2026New Kids On The Dock and their huge new Cat.(Ep 317)Apr 2026Cyclone Narelle, what actually happened?(Ep 316)Mar 2026Cyclone Narelle, live update from our sailboat. (Ep 315)Mar 2026

From Sailing Learning By Doing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue