Sailing Jibseaβίντεο
Tackling BIG JOB on ANCHOR! Re & Re STEERING CABLE & CONDUIT - Ep 152
25 Αυγούστου 2023 · 26 λεπτά · 19K προβολές
Τι καλύπτει αυτό το βίντεο
Replacing the steering cable and conduit on a 32-year-old center cockpit sailboat significantly reduces steering friction and improves wheel responsiveness.22:07 The project involves removing the steering pedestal, linkages, and old conduit runs to address stiffness caused by non-linear cable routing and worn components.3:03 New Edson Marine conduit and cabling are installed, featuring added grease fittings every five feet to ensure long-term lubrication.2:33 During the installation, the owner replaces wheel shaft bearings and cleans up existing cable runs to eliminate chafe points.8:01 To prevent internal melting when cutting conduit, the owner recommends rotating the conduit while grinding or using a drill bit to clear the inner sheath for a smooth cable path.23:38 The process requires precise measurement of cable lengths and careful alignment of the chain on the steering sprocket to ensure the wheel and autopilot remain centered.17:21 Replacing aged steering components and adding lubrication points transforms stiff, difficult steering into a smooth, responsive system.22:07
Περισσότερα από το Sailing Jibsea
Από Sailing Jibsea — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



