Sailing Jibseavídeo
Tackling BIG JOB on ANCHOR! Re & Re STEERING CABLE & CONDUIT - Ep 152
25 de agosto de 2023 · 26 min · 19K visitas
Qué cubre este vídeo
Replacing the steering cable and conduit on a 32-year-old center cockpit sailboat significantly reduces steering friction and improves wheel responsiveness.22:07 The project involves removing the steering pedestal, linkages, and old conduit runs to address stiffness caused by non-linear cable routing and worn components.3:03 New Edson Marine conduit and cabling are installed, featuring added grease fittings every five feet to ensure long-term lubrication.2:33 During the installation, the owner replaces wheel shaft bearings and cleans up existing cable runs to eliminate chafe points.8:01 To prevent internal melting when cutting conduit, the owner recommends rotating the conduit while grinding or using a drill bit to clear the inner sheath for a smooth cable path.23:38 The process requires precise measurement of cable lengths and careful alignment of the chain on the steering sprocket to ensure the wheel and autopilot remain centered.17:21 Replacing aged steering components and adding lubrication points transforms stiff, difficult steering into a smooth, responsive system.22:07
Más de Sailing Jibsea
De Sailing Jibsea — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



