Sailing Jibseavídeo

Tackling BIG JOB on ANCHOR! Re & Re STEERING CABLE & CONDUIT - Ep 152

25 de agosto de 2023 · 26 min · 19K visualizações

O que este vídeo aborda

Replacing the steering cable and conduit on a 32-year-old center cockpit sailboat significantly reduces steering friction and improves wheel responsiveness.22:07 The project involves removing the steering pedestal, linkages, and old conduit runs to address stiffness caused by non-linear cable routing and worn components.3:03 New Edson Marine conduit and cabling are installed, featuring added grease fittings every five feet to ensure long-term lubrication.2:33 During the installation, the owner replaces wheel shaft bearings and cleans up existing cable runs to eliminate chafe points.8:01 To prevent internal melting when cutting conduit, the owner recommends rotating the conduit while grinding or using a drill bit to clear the inner sheath for a smooth cable path.23:38 The process requires precise measurement of cable lengths and careful alignment of the chain on the steering sprocket to ensure the wheel and autopilot remain centered.17:21 Replacing aged steering components and adding lubrication points transforms stiff, difficult steering into a smooth, responsive system.22:07

Assistir no YouTube

Mais de Sailing Jibsea

Our First Time Sailing Norway’s Famous Fjords - Ep 283ago. de 2026When 2 Grown Kids Sail into Ålesund for the First Time - Ep 282ago. de 2026Rounding Norway's Most FEARED Headland Wasn't What We Expected - Ep 281jul. de 2026The Days That Keep Boat Life Going - Ep 280jul. de 2026

De Sailing Jibsea — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema