SV Rusty Junkβίντεο

Steel Sailboat Build Part 5

18 Νοεμβρίου 2017 · 5 λεπτά · 21K προβολές

Τι καλύπτει αυτό το βίντεο

The builder of the steel sailboat Rusty Junk works to align the hull-to-floor seams while the vessel sits on the ground in freezing conditions.0:16 To address alignment issues, the builder uses a hammer to manipulate the metal before welding, aiming for a flush, waterproof finish.1:16 The project requires lifting the hull to provide clearance for future keel installation.2:33 Initial attempts to raise the boat using poles and a jack fail, as the setup bounces without lifting the structure.4:39 A revised jacking strategy succeeds in lifting the hull, providing enough clearance to work underneath.4:54 The builder prioritizes completing the exterior seam welding and raising the hull before a forecasted five-day rainstorm, which will force work to move inside the boat.3:51 The current build progress reaches day 26, with the hull gaining enough structural stiffness to lift evenly on both sides.4:01

Παρακολουθήστε στο YouTube

Περισσότερα από το SV Rusty Junk

Boat life is not for meΣεπ 20252025 Chuckanut BayΙουλ 2025Steel Sailboat LaunchΑυγ 2024Steel Sailboat Update 2Οκτ 2023

Από SV Rusty Junk — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος