SV Rusty Junkvídeo

Steel Sailboat Build Part 5

18 de novembro de 2017 · 5 min · 21K visualizações

O que este vídeo aborda

The builder of the steel sailboat Rusty Junk works to align the hull-to-floor seams while the vessel sits on the ground in freezing conditions.0:16 To address alignment issues, the builder uses a hammer to manipulate the metal before welding, aiming for a flush, waterproof finish.1:16 The project requires lifting the hull to provide clearance for future keel installation.2:33 Initial attempts to raise the boat using poles and a jack fail, as the setup bounces without lifting the structure.4:39 A revised jacking strategy succeeds in lifting the hull, providing enough clearance to work underneath.4:54 The builder prioritizes completing the exterior seam welding and raising the hull before a forecasted five-day rainstorm, which will force work to move inside the boat.3:51 The current build progress reaches day 26, with the hull gaining enough structural stiffness to lift evenly on both sides.4:01

Assistir no YouTube

Mais de SV Rusty Junk

Boat life is not for meset. de 20252025 Chuckanut Bayjul. de 2025Steel Sailboat Launchago. de 2024Steel Sailboat Update 2out. de 2023

De SV Rusty Junk — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema