SV Rusty Junkvídeo

Steel Sailboat Build Part 5

18 de noviembre de 2017 · 5 min · 21K visitas

Qué cubre este vídeo

The builder of the steel sailboat Rusty Junk works to align the hull-to-floor seams while the vessel sits on the ground in freezing conditions.0:16 To address alignment issues, the builder uses a hammer to manipulate the metal before welding, aiming for a flush, waterproof finish.1:16 The project requires lifting the hull to provide clearance for future keel installation.2:33 Initial attempts to raise the boat using poles and a jack fail, as the setup bounces without lifting the structure.4:39 A revised jacking strategy succeeds in lifting the hull, providing enough clearance to work underneath.4:54 The builder prioritizes completing the exterior seam welding and raising the hull before a forecasted five-day rainstorm, which will force work to move inside the boat.3:51 The current build progress reaches day 26, with the hull gaining enough structural stiffness to lift evenly on both sides.4:01

Ver en YouTube

Más de SV Rusty Junk

Boat life is not for mesept 20252025 Chuckanut Bayjul 2025Steel Sailboat Launchago 2024Steel Sailboat Update 2oct 2023

De SV Rusty Junk — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema