Sailing Yabáβίντεο
We drilled the wrong hole! Boat building, beers, barbecue and friends — Sailing Yabá 180
26 Ιανουαρίου 2024 · 21 λεπτά · 67K προβολές
Τι καλύπτει αυτό το βίντεο
The crew of Yabá drills and installs through-hull fittings for the head and three bilge pumps while preparing the vessel for launch at a shipyard. To ensure proper drainage and prevent back-siphoning, the team maintains a minimum 6-inch vertical separation between the head's inlet and outlet, or a 12-inch horizontal distance.0:48 When drilling through thick, multi-layered hull planks—some measuring 8.5 centimeters—the crew uses pilot holes to ensure accuracy, followed by a hole saw.6:19 Because the hull thickness exceeds the length of the standard through-hull fittings, the crew sends the bronze and stainless steel hardware to a welder to be extended.8:15 After drilling, the holes are cleaned with ethanol and sealed with epoxy to cure.11:58 The team also tests the bilge pump relay system using temporary wiring to confirm the manual and automatic switches function correctly before finalizing the installation.18:58
Περισσότερα από το Sailing Yabá
Από Sailing Yabá — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



