Sailing Yabávideo

We drilled the wrong hole! Boat building, beers, barbecue and friends — Sailing Yabá 180

26 January 2024 · 21 min · 67K views

What this video covers

The crew of Yabá drills and installs through-hull fittings for the head and three bilge pumps while preparing the vessel for launch at a shipyard. To ensure proper drainage and prevent back-siphoning, the team maintains a minimum 6-inch vertical separation between the head's inlet and outlet, or a 12-inch horizontal distance.0:48 When drilling through thick, multi-layered hull planks—some measuring 8.5 centimeters—the crew uses pilot holes to ensure accuracy, followed by a hole saw.6:19 Because the hull thickness exceeds the length of the standard through-hull fittings, the crew sends the bronze and stainless steel hardware to a welder to be extended.8:15 After drilling, the holes are cleaned with ethanol and sealed with epoxy to cure.11:58 The team also tests the bilge pump relay system using temporary wiring to confirm the manual and automatic switches function correctly before finalizing the installation.18:58

Watch on YouTube

More from Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing YabáOct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing YabáOct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing YabáSept 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSept 2026

From Sailing Yabá — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue