Sailing Yabávideo
We drilled the wrong hole! Boat building, beers, barbecue and friends — Sailing Yabá 180
26. januar 2024 · 21 min · 67K visninger
Hva denne videoen dekker
The crew of Yabá drills and installs through-hull fittings for the head and three bilge pumps while preparing the vessel for launch at a shipyard. To ensure proper drainage and prevent back-siphoning, the team maintains a minimum 6-inch vertical separation between the head's inlet and outlet, or a 12-inch horizontal distance.0:48 When drilling through thick, multi-layered hull planks—some measuring 8.5 centimeters—the crew uses pilot holes to ensure accuracy, followed by a hole saw.6:19 Because the hull thickness exceeds the length of the standard through-hull fittings, the crew sends the bronze and stainless steel hardware to a welder to be extended.8:15 After drilling, the holes are cleaned with ethanol and sealed with epoxy to cure.11:58 The team also tests the bilge pump relay system using temporary wiring to confirm the manual and automatic switches function correctly before finalizing the installation.18:58
Mer fra Sailing Yabá
Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



