Sven Yrvindβίντεο

The First Molds Are Up.

9 Οκτωβρίου 2026 · 3 λεπτά · 4K προβολές

Τι καλύπτει αυτό το βίντεο

Sven Yrvind constructs the hull frames for a new boat, beginning with the installation of the first four frames. He identifies frame 21 as the largest in the series and utilizes a floor-mounted support system to maintain alignment, noting that previous methods of supporting frames directly on the profile caused unwanted bending.0:37 The assembly process proceeds sequentially, with frame 39 serving as the next point for support installation before the stem and stern sections are added. Yrvind plans to experiment with applying inside fibers first to the Divinycell core, a departure from his previous construction methods. He compares this current build to his 1986 project on the boat Breson PB, which featured a 50 mm thick Divinycell core compared to the 30 mm thickness used in this design. The structural integrity of the hull remains the primary focus as he continues to set the remaining frames.

Παρακολουθήστε στο YouTube

Περισσότερα από το Sven Yrvind

More molds up.Οκτ 2026Bending the Bottom a Bit.Οκτ 2026NM Epoxy and Mold Base.Οκτ 2026Two 5 8 meter aluminum profiles for the mold base.Οκτ 2026

Από Sven Yrvind — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος