Sven Yrvindvideo
The First Molds Are Up.
9 October 2026 · 3 min · 4K views
What this video covers
Sven Yrvind constructs the hull frames for a new boat, beginning with the installation of the first four frames. He identifies frame 21 as the largest in the series and utilizes a floor-mounted support system to maintain alignment, noting that previous methods of supporting frames directly on the profile caused unwanted bending.0:37 The assembly process proceeds sequentially, with frame 39 serving as the next point for support installation before the stem and stern sections are added. Yrvind plans to experiment with applying inside fibers first to the Divinycell core, a departure from his previous construction methods. He compares this current build to his 1986 project on the boat Breson PB, which featured a 50 mm thick Divinycell core compared to the 30 mm thickness used in this design. The structural integrity of the hull remains the primary focus as he continues to set the remaining frames.
More from Sven Yrvind
From Sven Yrvind — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



