Wildling Sailingβίντεο

My Catamaran Gets Chainplates!

17 Μαΐου 2024 · 21 λεπτά · 91K προβολές

Τι καλύπτει αυτό το βίντεο

Installation of five chainplates on a catamaran cabin top requires precise alignment of hardwood backing plates and structural sealing. To ensure a watertight fit, the process involves a dry-fit bolting sequence to align the hardware, followed by bonding the backing plates with epoxy. Because the intermediate shrouds meet the cabin top at a slight angle, the stainless steel chainplates require a four-to-five-degree bend to match the mast attachment point.9:19 This bending is performed using a workshop press.17:19 After the epoxy cures, the bolts are removed to allow for final sealing with Sikaflex sealant on the exterior.11:16 The project also includes plugging rub rail holes with waterproof wood glue and preparing for future rigging work using 10mm Dyneema.14:53 The goal is to reach a functional sailing condition within the summer season, with remaining tasks including the installation of running rigging, mast lights, and additional shrouds.

Παρακολουθήστε στο YouTube

Περισσότερα από το Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran RefitΟκτ 2026I Lifted Her Out For a Very Important Rebuild.Σεπ 2026One Final Refit Before Crossing The Atlantic.Αυγ 20262 Days Alone at Sea On my Primitive Double-Canoe.Αυγ 2026

Από Wildling Sailing — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος