Wildling Sailingvidéo
My Catamaran Gets Chainplates!
17 mai 2024 · 21 min · 91K vues
Ce que couvre cette vidéo
Installation of five chainplates on a catamaran cabin top requires precise alignment of hardwood backing plates and structural sealing. To ensure a watertight fit, the process involves a dry-fit bolting sequence to align the hardware, followed by bonding the backing plates with epoxy. Because the intermediate shrouds meet the cabin top at a slight angle, the stainless steel chainplates require a four-to-five-degree bend to match the mast attachment point.9:19 This bending is performed using a workshop press.17:19 After the epoxy cures, the bolts are removed to allow for final sealing with Sikaflex sealant on the exterior.11:16 The project also includes plugging rub rail holes with waterproof wood glue and preparing for future rigging work using 10mm Dyneema.14:53 The goal is to reach a functional sailing condition within the summer season, with remaining tasks including the installation of running rigging, mast lights, and additional shrouds.
Plus de vidéos de Wildling Sailing
De Wildling Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



