Wildling Sailingvídeo

My Catamaran Gets Chainplates!

17 de mayo de 2024 · 21 min · 91K visitas

Qué cubre este vídeo

Installation of five chainplates on a catamaran cabin top requires precise alignment of hardwood backing plates and structural sealing. To ensure a watertight fit, the process involves a dry-fit bolting sequence to align the hardware, followed by bonding the backing plates with epoxy. Because the intermediate shrouds meet the cabin top at a slight angle, the stainless steel chainplates require a four-to-five-degree bend to match the mast attachment point.9:19 This bending is performed using a workshop press.17:19 After the epoxy cures, the bolts are removed to allow for final sealing with Sikaflex sealant on the exterior.11:16 The project also includes plugging rub rail holes with waterproof wood glue and preparing for future rigging work using 10mm Dyneema.14:53 The goal is to reach a functional sailing condition within the summer season, with remaining tasks including the installation of running rigging, mast lights, and additional shrouds.

Ver en YouTube

Más de Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refitoct 2026I Lifted Her Out For a Very Important Rebuild.sept 2026One Final Refit Before Crossing The Atlantic.ago 20262 Days Alone at Sea On my Primitive Double-Canoe.ago 2026

De Wildling Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema