Sailing With Phoenix | Oliverβίντεο

Let the nightmare continue. 33 Days until I cross the Pacific Ocean.

29 Μαρτίου 2025 · 29 λεπτά · 9K προβολές

Τι καλύπτει αυτό το βίντεο

Repairing a deck hole for a windlass installation on With Phoenix | Oliver requires a multi-day fiberglass and epoxy process, complicated by high winds and heavy rain.0:02 Over approximately 12 days, the owner patches a hole in the deck by fiberglassing the underside, filling the top side with TotalBoat fairing compound, and sanding the surface flat.18:11 The repair involves creating a template to guide the fiberglass cuts and drilling pilot holes to ensure the windlass fits correctly.13:15 Throughout the project, the owner maintains a heated, tented workspace to manage moisture and curing times despite 40- to 50-mph wind gusts.0:27 After applying a barrier coat, the final step involves applying gel coat to the repaired area before mounting the windlass.25:10 The project is time-sensitive, as the owner must complete the installation before a rescheduled haul-out date.26:12

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing With Phoenix | Oliver

38 days until I sail around the world without stopping Αυγ 2026First Sail Alone Since Sailing To Hawai'iΑυγ 202664 Days Until I Sail Nonstop Around The WorldΙουλ 2026I've been doing a bad job...Μαΐ 2026

Από Sailing With Phoenix | Oliver — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος