Sailing With Phoenix | Olivervídeo

Let the nightmare continue. 33 Days until I cross the Pacific Ocean.

29 de marzo de 2025 · 29 min · 9K visitas

Qué cubre este vídeo

Repairing a deck hole for a windlass installation on With Phoenix | Oliver requires a multi-day fiberglass and epoxy process, complicated by high winds and heavy rain.0:02 Over approximately 12 days, the owner patches a hole in the deck by fiberglassing the underside, filling the top side with TotalBoat fairing compound, and sanding the surface flat.18:11 The repair involves creating a template to guide the fiberglass cuts and drilling pilot holes to ensure the windlass fits correctly.13:15 Throughout the project, the owner maintains a heated, tented workspace to manage moisture and curing times despite 40- to 50-mph wind gusts.0:27 After applying a barrier coat, the final step involves applying gel coat to the repaired area before mounting the windlass.25:10 The project is time-sensitive, as the owner must complete the installation before a rescheduled haul-out date.26:12

Ver en YouTube

Más de Sailing With Phoenix | Oliver

38 days until I sail around the world without stopping ago 2026First Sail Alone Since Sailing To Hawai'iago 202664 Days Until I Sail Nonstop Around The Worldjul 2026I've been doing a bad job...may 2026

De Sailing With Phoenix | Oliver — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema