MJ Sailingβίντεο

She Drills Holes, He Fills Them (MJ Sailing - Episode 369)

29 Νοεμβρίου 2025 · 19 λεπτά · 30K προβολές

Τι καλύπτει αυτό το βίντεο

Matt and Jessica install two Force Bar Pro seacocks and run electrical conduit through the structural bulkheads of their catamaran. To ensure independent water intake for a hybrid motor and an air conditioning system, they drill two separate through-hull openings in the engine bed area.0:24 They create recessed mounting pockets by wrapping the seacocks in tape to add thickness, glassing over them to create a mold, and fairing the resulting cavities.4:55

In the forward lazarette, the crew installs a 3-inch diameter, fire-resistant fiberglass tube to serve as a conduit for electrical and communication wiring.13:08 They select fiberglass over traditional conduit for its rigidity and smooth interior, which facilitates pulling long wire runs.13:16 Matt grinds the surrounding bulkhead paint to bare fiberglass and bonds the tube into place using Total Boat thickened resin and 12-ounce double-bias fiberglass cloth.15:37 This installation maintains the structural integrity of the mast-supporting bulkheads while providing a protected, organized pathway for 110-volt, 48-volt, 12-volt, and NEMA 2000 cables.18:59

Παρακολουθήστε στο YouTube

Περισσότερα από το MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)Αυγ 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)Ιουλ 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)Ιουν 2026Preparing Our Catamaran for Paint—and Me for Captain's SchoolΙουν 2026

Από MJ Sailing — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος