MJ Sailingvidéo

She Drills Holes, He Fills Them (MJ Sailing - Episode 369)

29 novembre 2025 · 19 min · 29K vues

Ce que couvre cette vidéo

Matt and Jessica install two Force Bar Pro seacocks and run electrical conduit through the structural bulkheads of their catamaran. To ensure independent water intake for a hybrid motor and an air conditioning system, they drill two separate through-hull openings in the engine bed area.0:24 They create recessed mounting pockets by wrapping the seacocks in tape to add thickness, glassing over them to create a mold, and fairing the resulting cavities.4:55

In the forward lazarette, the crew installs a 3-inch diameter, fire-resistant fiberglass tube to serve as a conduit for electrical and communication wiring.13:08 They select fiberglass over traditional conduit for its rigidity and smooth interior, which facilitates pulling long wire runs.13:16 Matt grinds the surrounding bulkhead paint to bare fiberglass and bonds the tube into place using Total Boat thickened resin and 12-ounce double-bias fiberglass cloth.15:37 This installation maintains the structural integrity of the mast-supporting bulkheads while providing a protected, organized pathway for 110-volt, 48-volt, 12-volt, and NEMA 2000 cables.18:59

Regarder sur YouTube

Plus de vidéos de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)août 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)juil. 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)juin 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljuin 2026

De MJ Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème