MJ Sailingvídeo

She Drills Holes, He Fills Them (MJ Sailing - Episode 369)

29 de novembro de 2025 · 19 min · 29K visualizações

O que este vídeo aborda

Matt and Jessica install two Force Bar Pro seacocks and run electrical conduit through the structural bulkheads of their catamaran. To ensure independent water intake for a hybrid motor and an air conditioning system, they drill two separate through-hull openings in the engine bed area.0:24 They create recessed mounting pockets by wrapping the seacocks in tape to add thickness, glassing over them to create a mold, and fairing the resulting cavities.4:55

In the forward lazarette, the crew installs a 3-inch diameter, fire-resistant fiberglass tube to serve as a conduit for electrical and communication wiring.13:08 They select fiberglass over traditional conduit for its rigidity and smooth interior, which facilitates pulling long wire runs.13:16 Matt grinds the surrounding bulkhead paint to bare fiberglass and bonds the tube into place using Total Boat thickened resin and 12-ounce double-bias fiberglass cloth.15:37 This installation maintains the structural integrity of the mast-supporting bulkheads while providing a protected, organized pathway for 110-volt, 48-volt, 12-volt, and NEMA 2000 cables.18:59

Assistir no YouTube

Mais de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)ago. de 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)jul. de 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)jun. de 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljun. de 2026

De MJ Sailing — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema