Sailing Yabáβίντεο

We could have done WITHOUT THIS STORM! — Sailing Yabá #25

25 Απριλίου 2021 · 30 λεπτά · 123K προβολές

Τι καλύπτει αυτό το βίντεο

Refurbishment of the wooden schooner Yabá continues in a shipyard in southern Brazil, with the crew focusing on completing the starboard side framing. Carpenters are currently installing the final frames, a process that requires precise beveling to ensure the pieces sit flush against the transom and stern post. The team uses templates to expedite the cutting and installation process, allowing for the completion of approximately four frames per day when materials are available. While the port side framing is finished, the starboard side remains the primary work area, with only eight frames left to install before planking begins. The crew notes that saltwater exposure preserved the original floor timbers, while rainwater caused rot in the upper beams and frames. Additionally, the project features a demonstration of a closed-loop freshwater engine cooling system installed on a neighboring vessel, which utilizes external copper pipes to dissipate heat without drawing raw seawater into the engine.

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Yabá

Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing YabáΑυγ 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing YabáΑυγ 2026This Anchorage Was Worth Every Miserable Mile — Sailing YabáΑυγ 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing YabáΑυγ 2026

Από Sailing Yabá — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος