Sailing Yabávideo

We could have done WITHOUT THIS STORM! — Sailing Yabá #25

25. april 2021 · 30 min · 123K visninger

Hva denne videoen dekker

Refurbishment of the wooden schooner Yabá continues in a shipyard in southern Brazil, with the crew focusing on completing the starboard side framing. Carpenters are currently installing the final frames, a process that requires precise beveling to ensure the pieces sit flush against the transom and stern post. The team uses templates to expedite the cutting and installation process, allowing for the completion of approximately four frames per day when materials are available. While the port side framing is finished, the starboard side remains the primary work area, with only eight frames left to install before planking begins. The crew notes that saltwater exposure preserved the original floor timbers, while rainwater caused rot in the upper beams and frames. Additionally, the project features a demonstration of a closed-loop freshwater engine cooling system installed on a neighboring vessel, which utilizes external copper pipes to dissipate heat without drawing raw seawater into the engine.

Se på YouTube

Mer fra Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáokt. 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáokt. 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep. 2026

Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem