Sailing Yabávideo

We could have done WITHOUT THIS STORM! — Sailing Yabá #25

25 aprile 2021 · 30 min · 123K visualizzazioni

Cosa tratta questo video

Refurbishment of the wooden schooner Yabá continues in a shipyard in southern Brazil, with the crew focusing on completing the starboard side framing. Carpenters are currently installing the final frames, a process that requires precise beveling to ensure the pieces sit flush against the transom and stern post. The team uses templates to expedite the cutting and installation process, allowing for the completion of approximately four frames per day when materials are available. While the port side framing is finished, the starboard side remains the primary work area, with only eight frames left to install before planking begins. The crew notes that saltwater exposure preserved the original floor timbers, while rainwater caused rot in the upper beams and frames. Additionally, the project features a demonstration of a closed-loop freshwater engine cooling system installed on a neighboring vessel, which utilizes external copper pipes to dissipate heat without drawing raw seawater into the engine.

Guarda su YouTube

Altro da Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáott 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáott 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabáset 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabáset 2026

Da Sailing Yabá — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema