Sailing Umaβίντεο

Drilling holes in our boat to make it unsinkable | Step 476

28 Φεβρουαρίου 2026 · 33 λεπτά · 119K προβολές

Driller in hazmat suit bores hull of white sailboat

Τι καλύπτει αυτό το βίντεο

Dan and Kika install multiple bilge pumps and reinforced polymer through-hull fittings to finalize the hull integrity of their boat during a refit. They select Whale and Johnson bilge pumps featuring detachable electronics, serviceable impellers, and integrated float switches for maintenance accessibility.1:12 To install the through-hulls, they use a specialized hole saw with a spring-loaded pin mechanism that ejects the fiberglass core plug, preventing the need for manual removal.8:23 After measuring and cutting the through-hulls to fit the variable hull thickness, they seal the fittings to ensure a watertight finish.13:23 The crew then permanently seals a temporary drainage hole in the cockpit bilge with epoxy and fiberglass.19:59 To verify the system, they perform a controlled flood test in the cockpit locker, confirming the pump clears the water in six minutes.30:38 These installations complete the hull sealing process, rendering the vessel theoretically ready for launch.

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Uma

4 Hours to Rig Solar for an 8-Month Solo CircumnavigationΣεπ 2026Solar Sponsor Backed Out Before Sailing Around the World !Σεπ 2026Our boat won’t look the same after this | Step 495Αυγ 2026The ONE Thing We Disagreed on This Entire Refit | Step 494Αυγ 2026

Από Sailing Uma — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος