Sailing Umavideo

Drilling holes in our boat to make it unsinkable | Step 476

28 febbraio 2026 · 33 min · 119K visualizzazioni

Driller in hazmat suit bores hull of white sailboat

Cosa tratta questo video

Dan and Kika install multiple bilge pumps and reinforced polymer through-hull fittings to finalize the hull integrity of their boat during a refit. They select Whale and Johnson bilge pumps featuring detachable electronics, serviceable impellers, and integrated float switches for maintenance accessibility.1:12 To install the through-hulls, they use a specialized hole saw with a spring-loaded pin mechanism that ejects the fiberglass core plug, preventing the need for manual removal.8:23 After measuring and cutting the through-hulls to fit the variable hull thickness, they seal the fittings to ensure a watertight finish.13:23 The crew then permanently seals a temporary drainage hole in the cockpit bilge with epoxy and fiberglass.19:59 To verify the system, they perform a controlled flood test in the cockpit locker, confirming the pump clears the water in six minutes.30:38 These installations complete the hull sealing process, rendering the vessel theoretically ready for launch.

Guarda su YouTube

Altro da Sailing Uma

We're Finally Setting Sail Again!set 20264 Hours to Rig Solar for an 8-Month Solo Circumnavigationset 2026Solar Sponsor Backed Out Before Sailing Around the World !set 2026Our boat won’t look the same after this | Step 495ago 2026

Da Sailing Uma — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema