Sailing Umaβίντεο

Solving The Problem With Our New Batteries (BUSES - Part 3) | Step 463

9 Νοεμβρίου 2025 · 24 λεπτά · 127K προβολές

Hands connect bus bar to battery with clean wiring

Τι καλύπτει αυτό το βίντεο

Dan and Kika install a new lithium battery bank in the cockpit locker and under the companionway of their boat, replacing an older system with one that provides four times the capacity at the same weight.21:06 To organize the installation, they 3D-print custom caps out of glass-reinforced nylon to hold fuse blocks and manage battery management system (BMS) cables.2:54 These caps feature threaded inserts and clips to ensure symmetrical wiring and consistent electrical resistance across the bank.3:24 The batteries include integrated bumpers that maintain a one-centimeter air gap between units for ventilation, eliminating the need for external spacers.22:28 The crew secures each battery using stainless steel mounting brackets bolted to the battery box floor.8:34 They also drill and epoxy drain holes in the corners of the battery boxes to prevent water accumulation, a recurring issue with their previous setup.7:20 The project concludes with the batteries and fuses in place, awaiting the final installation of a central bus bar system.18:43

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Uma

Our boat won’t look the same after this | Step 495Αυγ 2026The ONE Thing We Disagreed on This Entire Refit | Step 494Αυγ 2026We Owe You The Full StoryΙουλ 2026We spent $10,000 on something Pretty | Step 493Ιουλ 2026

Από Sailing Uma — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος