Sailing Umavideo

Solving The Problem With Our New Batteries (BUSES - Part 3) | Step 463

9 November 2025 · 24 min · 127K views

Hands connect bus bar to battery with clean wiring

What this video covers

Dan and Kika install a new lithium battery bank in the cockpit locker and under the companionway of their boat, replacing an older system with one that provides four times the capacity at the same weight.21:06 To organize the installation, they 3D-print custom caps out of glass-reinforced nylon to hold fuse blocks and manage battery management system (BMS) cables.2:54 These caps feature threaded inserts and clips to ensure symmetrical wiring and consistent electrical resistance across the bank.3:24 The batteries include integrated bumpers that maintain a one-centimeter air gap between units for ventilation, eliminating the need for external spacers.22:28 The crew secures each battery using stainless steel mounting brackets bolted to the battery box floor.8:34 They also drill and epoxy drain holes in the corners of the battery boxes to prevent water accumulation, a recurring issue with their previous setup.7:20 The project concludes with the batteries and fuses in place, awaiting the final installation of a central bus bar system.18:43

Watch on YouTube

More from Sailing Uma

Our boat won’t look the same after this | Step 495Aug 2026The ONE Thing We Disagreed on This Entire Refit | Step 494Aug 2026We Owe You The Full StoryJul 2026We spent $10,000 on something Pretty | Step 493Jul 2026

From Sailing Uma — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue