sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn
sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026

HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn

Sailing Uma · video

Solving The Problem With Our New Batteries (BUSES - Part 3) | Step 463

9. november 2025 · 24 min · 126K visninger

Hands connect bus bar to battery with clean wiring

Se på YouTube

Hva denne videoen dekker

Dan and Kika install a new lithium battery bank in the cockpit locker and under the companionway of their boat, replacing an older system with one that provides four times the capacity at the same weight.▶ 21:06 To organize the installation, they 3D-print custom caps out of glass-reinforced nylon to hold fuse blocks and manage battery management system (BMS) cables.▶ 2:54 These caps feature threaded inserts and clips to ensure symmetrical wiring and consistent electrical resistance across the bank.▶ 3:24 The batteries include integrated bumpers that maintain a one-centimeter air gap between units for ventilation, eliminating the need for external spacers.▶ 22:28 The crew secures each battery using stainless steel mounting brackets bolted to the battery box floor.▶ 8:34 They also drill and epoxy drain holes in the corners of the battery boxes to prevent water accumulation, a recurring issue with their previous setup.▶ 7:20 The project concludes with the batteries and fuses in place, awaiting the final installation of a central bus bar system.▶ 18:43

Mer fra Sailing Uma

Uma is Ready to Launch! (But there's a catch) | Step 489juni 2026How Many Sails Does it Take To Replace a Diesel Engine? | Step 488mai 2026Turning Our Powerboat Back Into a Sailboat | Step 487mai 2026We Cut our Mast in Half | Step 486mai 2026

Fra Sailing Uma – se kanalens båt, mannskap og alle analyserte videoer.

Rapporter et problem
HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026