Sailing SV Delosβίντεο

Why Is This Part SO FREAKING HARD??? (Aluminum Catamaran Build Pt 7)

4 Οκτωβρίου 2024 · 24 λεπτά · 284K προβολές · Australia

Τι καλύπτει αυτό το βίντεο

Fabricating the longeron and forward crossbeam for the 5083 aluminum expeditionary catamaran requires precise alignment to manage the structural loads of the forestay and anchor system.1:59 The longeron, a hollow structural member extending from the bridge deck, incorporates three chain plates for the jib, self-tacking jib, and downwind sails, while housing the anchor chain internally.1:11 During assembly, the crew encountered a 40-millimeter misalignment caused by incorrectly marked side plates, which they resolved by recalibrating measurements and using temporary bracing and a come-along to correct a twist.6:14 To prevent aluminum warping during welding, the team alternated sides and spaced out welds to distribute heat evenly.8:03 Final positioning involved using a laser level to ensure the structure was centered relative to the hull and bridge deck before tack welding.18:30 The project concluded with the installation of 32-millimeter thick chain plates and a Mantis Marine M2 anchor mount.22:02 Meticulous measurement and temporary structural bracing are essential for maintaining alignment when welding large, complex aluminum components.

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing SV Delos

Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85Σεπ 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84Αυγ 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83Αυγ 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82Αυγ 2026

Από Sailing SV Delos — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος