Sailing SV Delosvideo

Why Is This Part SO FREAKING HARD??? (Aluminum Catamaran Build Pt 7)

4 de octubre de 2024 · 24 min · 284K vistas · Australia

¿Qué cubre este video?

Fabricating the longeron and forward crossbeam for the 5083 aluminum expeditionary catamaran requires precise alignment to manage the structural loads of the forestay and anchor system.1:59 The longeron, a hollow structural member extending from the bridge deck, incorporates three chain plates for the jib, self-tacking jib, and downwind sails, while housing the anchor chain internally.1:11 During assembly, the crew encountered a 40-millimeter misalignment caused by incorrectly marked side plates, which they resolved by recalibrating measurements and using temporary bracing and a come-along to correct a twist.6:14 To prevent aluminum warping during welding, the team alternated sides and spaced out welds to distribute heat evenly.8:03 Final positioning involved using a laser level to ensure the structure was centered relative to the hull and bridge deck before tack welding.18:30 The project concluded with the installation of 32-millimeter thick chain plates and a Mantis Marine M2 anchor mount.22:02 Meticulous measurement and temporary structural bracing are essential for maintaining alignment when welding large, complex aluminum components.

Ver en YouTube

Más de Sailing SV Delos

Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85sep 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84ago 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83ago 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82ago 2026

De Sailing SV Delos — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema