Sailing SV Delosvídeo

Why Is This Part SO FREAKING HARD??? (Aluminum Catamaran Build Pt 7)

4 de outubro de 2024 · 24 min · 284K visualizações · Australia

O que este vídeo aborda

Fabricating the longeron and forward crossbeam for the 5083 aluminum expeditionary catamaran requires precise alignment to manage the structural loads of the forestay and anchor system.1:59 The longeron, a hollow structural member extending from the bridge deck, incorporates three chain plates for the jib, self-tacking jib, and downwind sails, while housing the anchor chain internally.1:11 During assembly, the crew encountered a 40-millimeter misalignment caused by incorrectly marked side plates, which they resolved by recalibrating measurements and using temporary bracing and a come-along to correct a twist.6:14 To prevent aluminum warping during welding, the team alternated sides and spaced out welds to distribute heat evenly.8:03 Final positioning involved using a laser level to ensure the structure was centered relative to the hull and bridge deck before tack welding.18:30 The project concluded with the installation of 32-millimeter thick chain plates and a Mantis Marine M2 anchor mount.22:02 Meticulous measurement and temporary structural bracing are essential for maintaining alignment when welding large, complex aluminum components.

Assistir no YouTube

Mais de Sailing SV Delos

Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85set. de 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84ago. de 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83ago. de 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82ago. de 2026

De Sailing SV Delos — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema