SV Rusty Junkβίντεο

Steel Sailboat Build Part 9

16 Δεκεμβρίου 2017 · 7 λεπτά · 21K προβολές

Τι καλύπτει αυτό το βίντεο

The builder aligns the steel keel of the Rusty Junk by using a combination of mechanical pressure, heat, and strategic cutting. After initial attempts to pull the keel into alignment using winches and propane heat proved ineffective, the builder cuts the metal along the alignment line to allow for inward bending.1:45 The keel structure incorporates internal tabs for symmetry, which are secured with double-pass welds to ensure both structural strength and a waterproof seal.6:35 Ballast installation involves filling the keel cavity with approximately 500 pounds of scrap metal, including car springs, supplemented by 600 pounds of concrete.5:45 The builder estimates the final boat displacement at 7,000 to 8,000 pounds, with a target of 3,000 pounds of total ballast.4:39 To secure additional external weight, the builder welds heavy-duty bolts to the keel base, ensuring each attachment point connects to internal support structures within the hull.5:13 Strategic welding and precise pressure application are necessary to align heavy steel plate components.

Παρακολουθήστε στο YouTube

Περισσότερα από το SV Rusty Junk

Boat life is not for meΣεπ 20252025 Chuckanut BayΙουλ 2025Steel Sailboat LaunchΑυγ 2024Steel Sailboat Update 2Οκτ 2023

Από SV Rusty Junk — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος