Steel Sailboat Build Part 9

16 décembre 2017 · 7 min · 21K vues

Ce que couvre cette vidéo

The builder aligns the steel keel of the Rusty Junk by using a combination of mechanical pressure, heat, and strategic cutting. After initial attempts to pull the keel into alignment using winches and propane heat proved ineffective, the builder cuts the metal along the alignment line to allow for inward bending.1:45 The keel structure incorporates internal tabs for symmetry, which are secured with double-pass welds to ensure both structural strength and a waterproof seal.6:35 Ballast installation involves filling the keel cavity with approximately 500 pounds of scrap metal, including car springs, supplemented by 600 pounds of concrete.5:45 The builder estimates the final boat displacement at 7,000 to 8,000 pounds, with a target of 3,000 pounds of total ballast.4:39 To secure additional external weight, the builder welds heavy-duty bolts to the keel base, ensuring each attachment point connects to internal support structures within the hull.5:13 Strategic welding and precise pressure application are necessary to align heavy steel plate components.

Regarder sur YouTube

Plus de vidéos de SV Rusty Junk

Boat life is not for mesept. 20252025 Chuckanut Bayjuil. 2025Steel Sailboat Launchaoût 2024Steel Sailboat Update 2oct. 2023

De SV Rusty Junk — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème