SV Rusty Junkvídeo

Steel Sailboat Build Part 9

16 de dezembro de 2017 · 7 min · 21K visualizações

O que este vídeo aborda

The builder aligns the steel keel of the Rusty Junk by using a combination of mechanical pressure, heat, and strategic cutting. After initial attempts to pull the keel into alignment using winches and propane heat proved ineffective, the builder cuts the metal along the alignment line to allow for inward bending.1:45 The keel structure incorporates internal tabs for symmetry, which are secured with double-pass welds to ensure both structural strength and a waterproof seal.6:35 Ballast installation involves filling the keel cavity with approximately 500 pounds of scrap metal, including car springs, supplemented by 600 pounds of concrete.5:45 The builder estimates the final boat displacement at 7,000 to 8,000 pounds, with a target of 3,000 pounds of total ballast.4:39 To secure additional external weight, the builder welds heavy-duty bolts to the keel base, ensuring each attachment point connects to internal support structures within the hull.5:13 Strategic welding and precise pressure application are necessary to align heavy steel plate components.

Ver no YouTube

Mais de SV Rusty Junk

Boat life is not for me09/20252025 Chuckanut Bay07/2025Steel Sailboat Launch08/2024Steel Sailboat Update 210/2023

De SV Rusty Junk — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema