MJ Sailingβίντεο

The Support Beams Are Added to Our Cabin Top (MJ Sailing - Ep 313)

9 Δεκεμβρίου 2023 · 19 λεπτά · 42K προβολές · Kent Island

Τι καλύπτει αυτό το βίντεο

Installation of structural support beams on the cabin top requires precise alignment and bonding to manage compression loads from the mast and traveler. The crew installs a centerline beam to prevent the forward bulkhead from pulling toward the mast under tension from halyards and winches.1:28 Before bonding, they run electrical conduit for lighting and solar wiring through the beams, using string to pull the lines through before the tubes are permanently fixed.7:26 They use methacrylate adhesive to bond the beams to the fiberglass cabin top, applying two large beads along the six-inch flanges to ensure full coverage and structural integrity.13:44 Jack stands provide upward pressure to hold the beams in place during the 90-minute curing window.15:20 After the beams set, the crew identifies a missing backing plate for the aft traveler support, necessitating a future cutout and repair.17:04 Proper preparation of the fiberglass surface by sanding and keying is essential for the adhesive to bond effectively.5:45

Παρακολουθήστε στο YouTube

Περισσότερα από το MJ Sailing

The Ultimate Off-Grid Upgrade: Unboxing 8 Lithium Batteries!Οκτ 2026How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)Αυγ 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)Ιουλ 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)Ιουν 2026

Από MJ Sailing — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος