MJ Sailingvideo

The Support Beams Are Added to Our Cabin Top (MJ Sailing - Ep 313)

9. desember 2023 · 19 min · 42K visninger · Kent Island

Hva denne videoen dekker

Installation of structural support beams on the cabin top requires precise alignment and bonding to manage compression loads from the mast and traveler. The crew installs a centerline beam to prevent the forward bulkhead from pulling toward the mast under tension from halyards and winches.1:28 Before bonding, they run electrical conduit for lighting and solar wiring through the beams, using string to pull the lines through before the tubes are permanently fixed.7:26 They use methacrylate adhesive to bond the beams to the fiberglass cabin top, applying two large beads along the six-inch flanges to ensure full coverage and structural integrity.13:44 Jack stands provide upward pressure to hold the beams in place during the 90-minute curing window.15:20 After the beams set, the crew identifies a missing backing plate for the aft traveler support, necessitating a future cutout and repair.17:04 Proper preparation of the fiberglass surface by sanding and keying is essential for the adhesive to bond effectively.5:45

Se på YouTube

Mer fra MJ Sailing

The Ultimate Off-Grid Upgrade: Unboxing 8 Lithium Batteries!okt. 2026How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)aug. 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)juli 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)juni 2026

Fra MJ Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem