kentblairlβίντεο
O'Day Day Sailer II CYANE 20 Apr 20 Pre Mast Raising Checklist
21 Απριλίου 2020 · 2 λεπτά · 8K προβολές
Τι καλύπτει αυτό το βίντεο
Kent Blair prepares a 1971 O'Day Day Sailer II named CYANE for mast stepping by securing the hull to a vehicle to prevent the stern from tipping.0:13 The rigging setup includes a roller furling system attached to a tang positioned between the spinnaker halyard and the jib halyard.0:20 This configuration allows for either a forestay and jib halyard or a roller furling setup.0:36 A control line runs from the lower furling drum to a block on the bow to facilitate tensioning.0:56 During the mast-raising process, the operator stands in the center of the cockpit to lift and steady the mast while pulling the red furling line forward to engage the hinge plate.1:27 Once the mast is stepped, the forward pin is removed to bend the hinge plate, allowing the furler to be connected.1:27 Proper stabilization of the hull and clear routing of the furling line are essential for a solo mast-raising procedure.
Σκάφη σε αυτό το βίντεο
Περισσότερα από το kentblairl
Από kentblairl — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



