kentblairlvideo

O'Day Day Sailer II CYANE 20 Apr 20 Pre Mast Raising Checklist

21 aprile 2020 · 2 min · 8K visualizzazioni

Cosa tratta questo video

Kent Blair prepares a 1971 O'Day Day Sailer II named CYANE for mast stepping by securing the hull to a vehicle to prevent the stern from tipping.0:13 The rigging setup includes a roller furling system attached to a tang positioned between the spinnaker halyard and the jib halyard.0:20 This configuration allows for either a forestay and jib halyard or a roller furling setup.0:36 A control line runs from the lower furling drum to a block on the bow to facilitate tensioning.0:56 During the mast-raising process, the operator stands in the center of the cockpit to lift and steady the mast while pulling the red furling line forward to engage the hinge plate.1:27 Once the mast is stepped, the forward pin is removed to bend the hinge plate, allowing the furler to be connected.1:27 Proper stabilization of the hull and clear routing of the furling line are essential for a solo mast-raising procedure.

Guarda su YouTube

Barche in questo video

O'Day DaysailerLa loro barca

Altro da kentblairl

Bahamas Dinghy HENNING Tape Removalset 2026Nutshell Pram Tiller Repair IIgiu 2026Nutshell Pram Tiller Repairgiu 2026Bottle Jack Servicingmag 2026

Da kentblairl — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema