kentblairlvideo

O'Day Day Sailer II CYANE 20 Apr 20 Pre Mast Raising Checklist

21 April 2020 · 2 min · 8K views

What this video covers

Kent Blair prepares a 1971 O'Day Day Sailer II named CYANE for mast stepping by securing the hull to a vehicle to prevent the stern from tipping.0:13 The rigging setup includes a roller furling system attached to a tang positioned between the spinnaker halyard and the jib halyard.0:20 This configuration allows for either a forestay and jib halyard or a roller furling setup.0:36 A control line runs from the lower furling drum to a block on the bow to facilitate tensioning.0:56 During the mast-raising process, the operator stands in the center of the cockpit to lift and steady the mast while pulling the red furling line forward to engage the hinge plate.1:27 Once the mast is stepped, the forward pin is removed to bend the hinge plate, allowing the furler to be connected.1:27 Proper stabilization of the hull and clear routing of the furling line are essential for a solo mast-raising procedure.

Watch on YouTube

Boats in this video

O'Day DaysailerTheir boat

More from kentblairl

Bahamas Dinghy HENNING Tape RemovalSept 2026Nutshell Pram Tiller Repair IIJun 2026Nutshell Pram Tiller RepairJun 2026Bottle Jack ServicingMay 2026

From kentblairl — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue