Sailing Yabáβίντεο

Celebrating a MILESTONE: last FRAMES installed! — Sailing Yabá #29

23 Μαΐου 2021 · 28 λεπτά · 105K προβολές

Τι καλύπτει αυτό το βίντεο

The crew of the wooden schooner Yabá completed the installation of the vessel's final replacement frames, marking a significant milestone in the boat's structural restoration.0:25 After discovering widespread rot, the owners decided to replace all frames to ensure the vessel's integrity.0:03 The project faced delays due to heavy rain and flooding, which prevented the delivery of necessary timber.0:16 With the new wood arrived, the team finished the remaining six frames and began addressing damaged floor timbers in the engine room.10:06 The crew identified that previous structural failures, including cracked floor timbers, resulted from improper placement of iron fasteners and excessive stress on the wood grain.10:34 To protect the new timber, the team is using a synthetic, non-toxic grey primer instead of traditional lead-based red lead.18:12 The crew also explained the staggered joint technique used on the sheer planks to maintain structural strength.22:22 While the frames are now in place, they still require final bolting to complete the structural rebuild.25:55

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing YabáΟκτ 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing YabáΟκτ 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing YabáΣεπ 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáΣεπ 2026

Από Sailing Yabá — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος