Sailing Yabávideo

Celebrating a MILESTONE: last FRAMES installed! — Sailing Yabá #29

23 May 2021 · 28 min · 105K views

What this video covers

The crew of the wooden schooner Yabá completed the installation of the vessel's final replacement frames, marking a significant milestone in the boat's structural restoration.0:25 After discovering widespread rot, the owners decided to replace all frames to ensure the vessel's integrity.0:03 The project faced delays due to heavy rain and flooding, which prevented the delivery of necessary timber.0:16 With the new wood arrived, the team finished the remaining six frames and began addressing damaged floor timbers in the engine room.10:06 The crew identified that previous structural failures, including cracked floor timbers, resulted from improper placement of iron fasteners and excessive stress on the wood grain.10:34 To protect the new timber, the team is using a synthetic, non-toxic grey primer instead of traditional lead-based red lead.18:12 The crew also explained the staggered joint technique used on the sheer planks to maintain structural strength.22:22 While the frames are now in place, they still require final bolting to complete the structural rebuild.25:55

Watch on YouTube

More from Sailing Yabá

Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing YabáAug 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing YabáAug 2026This Anchorage Was Worth Every Miserable Mile — Sailing YabáAug 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing YabáAug 2026

From Sailing Yabá — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue