Sailing Yabávideo

Celebrating a MILESTONE: last FRAMES installed! — Sailing Yabá #29

23 de mayo de 2021 · 28 min · 105K vistas

¿Qué cubre este video?

The crew of the wooden schooner Yabá completed the installation of the vessel's final replacement frames, marking a significant milestone in the boat's structural restoration.0:25 After discovering widespread rot, the owners decided to replace all frames to ensure the vessel's integrity.0:03 The project faced delays due to heavy rain and flooding, which prevented the delivery of necessary timber.0:16 With the new wood arrived, the team finished the remaining six frames and began addressing damaged floor timbers in the engine room.10:06 The crew identified that previous structural failures, including cracked floor timbers, resulted from improper placement of iron fasteners and excessive stress on the wood grain.10:34 To protect the new timber, the team is using a synthetic, non-toxic grey primer instead of traditional lead-based red lead.18:12 The crew also explained the staggered joint technique used on the sheer planks to maintain structural strength.22:22 While the frames are now in place, they still require final bolting to complete the structural rebuild.25:55

Ver en YouTube

Más de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáoct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáoct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep 2026

De Sailing Yabá — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema