A Boat in the Woodsβίντεο

After 2 Years Under a Tarp, It’s Time for a Shop Upgrade (And Puppies) - No. 40

4 Ιουλίου 2026 · 18 λεπτά · 194K προβολές · Bay of Fundy

Τι καλύπτει αυτό το βίντεο

Joshua is building a workshop in Eastern Canada to replace two years of working on a wooden sailboat under a tarp, exposed to rain, snow, and Bay of Fundy winds.Watch The structure uses two 40-foot shipping containers — each weighing 8,600 pounds — set on hemlock 4x4s on a slate pad, with a framed roof spanning between them.1:41 He chose containers for wind and snow resistance, secure tool storage, and portability: the roof is designed to disassemble and pack into the containers when the boat repair is complete.2:16 An excavator prepared the site; a driver delivered and winched the containers into position.0:41 Lumber comes from a local sawmill in hemlock, hauled in truckloads to minimize trips; a free 8x8 reject beam will later support the boat's keel.8:09 Joshua explains proper lumber stacking with stickers — thin wood strips that stabilize the pile, prevent warping, and promote even airflow for drying green hemlock.10:57 Two St. Bernard–Newfoundland puppies, Mara and Niska, also join the project.10:29 The workshop framing has not yet begun; next steps are squaring the containers and attaching trusses.6:48

Παρακολουθήστε στο YouTube

Περισσότερα από το A Boat in the Woods

Hurricane Ties, Bracing, Turning the Truck into Scaffolding - No. 46Αυγ 2026Framing the Roof of My Boat Shed with My Improvised Crane Truck - No. 45Αυγ 2026I Built My Boatshed's Roof on the Ground… Now How Do I Lift It? - No. 44Αυγ 2026Huge Progress on the Boat Shed - No. 43Αυγ 2026

Από A Boat in the Woods — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος