A Boat in the Woodsvídeo

After 2 Years Under a Tarp, It’s Time for a Shop Upgrade (And Puppies) - No. 40

4 de julio de 2026 · 18 min · 194K visitas · Bay of Fundy

Qué cubre este vídeo

Joshua is building a workshop in Eastern Canada to replace two years of working on a wooden sailboat under a tarp, exposed to rain, snow, and Bay of Fundy winds.Watch The structure uses two 40-foot shipping containers — each weighing 8,600 pounds — set on hemlock 4x4s on a slate pad, with a framed roof spanning between them.1:41 He chose containers for wind and snow resistance, secure tool storage, and portability: the roof is designed to disassemble and pack into the containers when the boat repair is complete.2:16 An excavator prepared the site; a driver delivered and winched the containers into position.0:41 Lumber comes from a local sawmill in hemlock, hauled in truckloads to minimize trips; a free 8x8 reject beam will later support the boat's keel.8:09 Joshua explains proper lumber stacking with stickers — thin wood strips that stabilize the pile, prevent warping, and promote even airflow for drying green hemlock.10:57 Two St. Bernard–Newfoundland puppies, Mara and Niska, also join the project.10:29 The workshop framing has not yet begun; next steps are squaring the containers and attaching trusses.6:48

Ver en YouTube

Más de A Boat in the Woods

Hurricane Ties, Bracing, Turning the Truck into Scaffolding - No. 46ago 2026Framing the Roof of My Boat Shed with My Improvised Crane Truck - No. 45ago 2026I Built My Boatshed's Roof on the Ground… Now How Do I Lift It? - No. 44ago 2026Huge Progress on the Boat Shed - No. 43ago 2026

De A Boat in the Woods — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema