A Boat in the Woodsvideo

After 2 Years Under a Tarp, It’s Time for a Shop Upgrade (And Puppies) - No. 40

July 4, 2026 · 18 min · 203K views · Bay of Fundy

What this video covers

Joshua is building a workshop in Eastern Canada to replace two years of working on a wooden sailboat under a tarp, exposed to rain, snow, and Bay of Fundy winds.Watch The structure uses two 40-foot shipping containers — each weighing 8,600 pounds — set on hemlock 4x4s on a slate pad, with a framed roof spanning between them.1:41 He chose containers for wind and snow resistance, secure tool storage, and portability: the roof is designed to disassemble and pack into the containers when the boat repair is complete.2:16 An excavator prepared the site; a driver delivered and winched the containers into position.0:41 Lumber comes from a local sawmill in hemlock, hauled in truckloads to minimize trips; a free 8x8 reject beam will later support the boat's keel.8:09 Joshua explains proper lumber stacking with stickers — thin wood strips that stabilize the pile, prevent warping, and promote even airflow for drying green hemlock.10:57 Two St. Bernard–Newfoundland puppies, Mara and Niska, also join the project.10:29 The workshop framing has not yet begun; next steps are squaring the containers and attaching trusses.6:48

Watch on YouTube

More from A Boat in the Woods

Solo Boat Shed Build | 1 Side Roof Down, 1 to Go - No. 50Oct 2026Boat Shed Posts & Beams, Back to Work on the Boat - No. 50Oct 2026I Left the Woods to Learn How to Fix My BoatSep 2026Finishing the Roof & The Boat is Finally Home - No. 47Sep 2026

From A Boat in the Woods — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue